OFFICE
3 Stevenson Square,
Manchester M1 1DN
(+44) 161 521 3234
info@createitstudios.co.uk

Helping You Build Inspiring spaces with expert Architecture
Building Regulations Simplified
Build with Confidence. We Handle the Compliance So You Can Focus on the Vision.
We Ensure Compliance with Ease
Award Winning Architects
We are proud to be recognised as a leading architectural design practice in the UK
Stories of Transformation
THE PROCESS
Initial consultation
Submission of plans and specifications
Approval and construction
Final inspection and certification
Building regulations and planning permission are not the same thing
Planning permission is about whether you're allowed to build something — the principle, the use, the size, the look, the impact on neighbours and the street. Building regulations are about whether what you build is safe, healthy, warm and properly constructed. A scheme can have full planning permission and still fail building control, and a project can need building regulations approval even when it needs no planning permission at all.
The Approved Documents, A to S
When you need building control — and the two ways to apply
Local authority or an approved inspector
Building control can be carried out either by your local authority or by a private registered building control approver (formerly "approved inspector"). Both enforce the same regulations. The local authority route is familiar and locally accountable; a private approver can sometimes offer more flexibility on timing. We'll advise which suits your project, and we deal with whichever body is appointed on your behalf.
The completion certificate — and why it matters when you sell
When the work passes final inspection, building control issues a completion certificate. Keep it safe. When you come to sell or remortgage, the buyer's solicitor will ask for it on any work that needed approval. Missing certificates are one of the commonest causes of delayed or collapsed sales, and they can force expensive retrospective applications — so it's worth getting right the first time.
Where projects most often fail compliance
Indicative timescales and fees
Listed buildings and the regulations
Frequently Asked Questions
Planning permission decides whether you're allowed to build something; building regulations decide whether what you build is safe and properly constructed. They're separate approvals on separate tracks, and most projects need both. Having planning permission doesn't mean you've met building regulations.
Most work beyond simple repairs does — extensions, loft and garage conversions, removing structural walls, new buildings and most changes of use. Some minor work is exempt. If you're unsure, ask us before you start; it's far cheaper than fixing it afterwards.
A full plans application gets your drawings approved before work begins, which is safer for structural, commercial or for-sale projects. A building notice is a lighter route for straightforward domestic work, checked on site as it progresses, with no detailed pre-approval.
Yes. Building control can be done by your local authority or by a registered private building control approver. Both enforce the same regulations. We'll recommend which suits your project and deal with whichever is appointed.
It's your proof the work was approved. When you sell or remortgage, the buyer's solicitor will ask for it on any work that needed building control. A missing certificate can delay or collapse a sale, so keep it safe.
In our experience: fire safety and escape in commercial fit-outs and flats, insulation and air-tightness falling short of the energy standards, stairs and accessibility dimensions, and drainage that wasn't planned early enough. Nearly all are cheap to design in and costly to fix once built.
Yes — they apply alongside listed building consent, and the two can pull in different directions. The skill is finding a solution that is both compliant and sympathetic to the historic fabric. We handle both approvals together so they don't contradict each other.
Subscribe to our monthly newsletter and get updates and industrial insights delivered to your inbox.
Back to top