OFFICE
3 Stevenson Square,
Manchester M1 1DN
(+44) 161 521 3234
info@createitstudios.co.uk
The draft has substantial and wide-ranging updates, amendments and new clauses across all elements of the standard.
Some key changes to the revised proposed BS 9991:
The introduction of guidance for Evac lift and lobby design and specification
Reduction in height threshold for non-combustible A1/A2 external wall build ups to 11m
Introduction of evacuation alert systems to BS 8629:2019 for buildings over 18m
Clarification on open plan kitchens
Revision to open plan design
Clarification and amendments to smoke ventilation requirements
Update to sprinkler requirements including reduction in height threshold to 11m
Get in contact for further details.
Subscribe to our monthly newsletter and get updates and industrial insights delivered to your inbox.
Back to top
We use cookies to allow us to enhance your browsing experience and better understand how the site is used. By continuing to use this site, you consent to this policy.